Orlando, FL
Decks and ramps
A deck takes weather, foot traffic, and whatever the last crew left behind. Ronnie builds them and rebuilds them.
Same roof deck, start to finish
Same house. Demo, the framing opened up, boards on, then the rail.
- 01Demo

Demo on the old roof-deck surface. A worn gray layer is still down, and a lighter section is open near the wall. - 02Opened up

New joists going in. Older framing and insulation are still visible in the bays. - 03Boards on

Boards down and posts up. The bottom rail is drilled for the balusters. The balusters are not on yet. - 04Finished

Finished roof deck. New boards, a wood rail, and dark metal balusters, above the shingle roof.
The photos here are one roof deck in Orlando, followed from demo through the finished rail. The old surface came off. New joists went in. Boards, posts, a gate, and dark metal balusters finished it.
On that demo, three older decks were stacked underneath. You never know what you're going to find. If the framing is sound, he'll say so. If it isn't, he'll show you before the work keeps going.
He also builds ramps. If that's the job, say so on the form and send a photo of the rise and the door.
What's included
- New decks and deck rebuilds
- Rails, balusters, and gates
- Ramps
- Opening up old layers before the new work starts
Photos







